Park Lane, Croydon and another utilities job delivered
Posted on 20th July 2026 by Grace Goodall
1 minute read time
We were on site supporting utilities works on a live road, with a two-way light system running throughout to keep traffic moving safely in both directions. 60m of barrier installed across the site with 2 ramps maintaining safe access at all times.

What we had on the ground:
→ 2-way lights — keeping traffic flowing safely in both directions throughout the works
→ Cyclist signage — making sure vulnerable road users were clearly guided through the site
→ 60m of barrier — securing the full site perimeter from day one
→ 2 x ramps — maintaining safe access across the works at all times
→ Man on site — there throughout to manage the operation and deal with anything as it comes up
→ Full Traffic Management Plan — the planning document that holds the whole operation together

Keeping a live road safe and functional while works are carried out underneath takes proper planning and the right people on the ground. Works completed safely and without disruption to the surrounding area.

Got utilities works coming up? Nationwide Traffic Solutions cover the whole country. Get in touch and we will get it sorted.
